×

About

We provide world class Project Advisory and Support for Clients seeking to develop Energy Projects within Nigeria and the West African Region from Conceptualisation to Early Stage Development, Financial Close, EPC Phase and unto Successful Completion.

Newsletter

Subscribe to Our Newsletter:

Our Profile

section-ac37bbf

Our Profile

We have a proven track record and strong credentials in conducting market assessments and advisory support across the entire oil & gas value chain.

section-8fcf71c

Project Profile (i)

We design commercial frameworks and advise on transactions that help private investors develop and fund new projects.

section-b5bb52e
LPG DEVELOPMENT  STUDY (2020) LPG DEVELOPMENT STUDY (2020)

SKA ENERGY, ABUJA Under a sub-contract from Petroleum Equalization Fund, Ecocity is carrying out Feasibility Study and developing the Policy Framework for development of the Gas Infrastructure Fund in Nigeria. Study is expected to end in September 2020

NNPC LPG LAST MILE  PROJECT (2020) NNPC LPG LAST MILE PROJECT (2020)

NOR ENERGY / NNPC LPG Ecocity has led discussions and engagement with NNPC LPG for the development of last mile distribution network through a franchising scheme to be operated by Nor Energy/Ecocity across Nigeria.

12,000BOPD MODULAR  REFINERY, NIGERIA  (2019) 12,000BOPD MODULAR REFINERY, NIGERIA (2019)

HIGHLAND REFINERY, JIGAWA Ecocity is the coordinator for a 12,000barrels per day modular refinery proposed by Highland Refinery and Petro Chemical Ltd (HRPC) to be located in Jigawa, Nigeria. Crude Oil feedstock shall be supplied from Niger Republic.

section-7a6b08f
GAS SUPPLY TO 500MW  IPP, NIGERIA 2018 GAS SUPPLY TO 500MW IPP, NIGERIA 2018

SUPERTEK, AJAOKUTA Assisted Supertek in developing strategy for sourcing of gas feedstock for proposed 500MW IPP licensed by NERC for development in Ajaokuta, Kogi State. Undertook engagement with Shell and NGC on behalf of client.

LPG TERMINAL PROJECT  NIGERIA (2018) LPG TERMINAL PROJECT NIGERIA (2018)

SUBLIME OIL & GAS, LAGOS Prepared pre-feasibility study for establishment of 22,000m3 Propane and Butane Storage Terminal. The hub is designed to receive molecules from Dangote Refinery and other sources for resupply into the Nigerian market.

LPG BOTTLING PLANT  NIGERIA (2012-2018) LPG BOTTLING PLANT NIGERIA (2012-2018)

SUBLIME OIL & GAS, LAGOS Provided Technical Advisory and support to Sublime from 2012 to 2018 during which period assisted in the successful establishment of Sublime’s 120ton LPG Bottling and distribution Plant in Kaduna, northern Nigeria in 2014.

section-9aba105

Project Profile (ii)

Ecocity has carried out various engagements on behalf of Government and Private Organisations providing policy frameworks, regulatory reforms and advise on transactions that help drive market growth.

section-a0a77a3
LPG DEVELOPMENT  STUDY (2018) LPG DEVELOPMENT STUDY (2018)

DELTA AFRIK ENGINEERING, LAGOS Carried out nationwide market survey to acquire data on Gas production, storage and distribution facilities as an input to Nigeria LPG Framework Development Study (Project 11802).

LPG MARKET REFORMS  PLAN LAGOS (2018) LPG MARKET REFORMS PLAN LAGOS (2018)

Carried out nationwide market survey to acquire data on Gas production, storage and distribution facilities as an input to Nigeria LPG Framework Development Study (Project 11802). LPG DEVELOPMENT STUDY (2018) MINISTRY OF ENERGY, LAGOS Participated in the LPG Reforms Committee alongside PWC for development of Policy Framework for reforms and development of the LPG sector in Lagos State. Ecocity Led the Technical Sub-Committee.

LIGHT UP LAGOS  PROJECT (2017) LIGHT UP LAGOS PROJECT (2017)

MINISTRY OF ENERGY, LAGOS Ecocity worked as part of a Committee comprising of Shell, Siemens and General Electric, for the development, procurement and distribution of 3,000MW of Electricity for Lagos State. Participated in the Gas and Power Sub-Committees.

section-bc19057
100MGD WATER  SUPPLY PROJECT,  NIGERIA 2016 100MGD WATER SUPPLY PROJECT, NIGERIA 2016

BRIO RESOURCES LTD, LAGOS Joint venture with Brio for the development of PPP Concession for a 100million gallons per day fresh water treatment plant ex Osun River. Project included transmission systems, and a reticulation network for last mile distribution in Lekki Peninsular.

FLOATING STORAGE &  REGAS UNIT (FSRU),  NIGERIA (2015) FLOATING STORAGE & REGAS UNIT (FSRU), NIGERIA (2015)

WESTCOM, LAGOS Undertook a study for the establishment of a Floating ‘LNG' Storage and Regasification Unit (“FSRU”) offshore Lagos State. Project designed to supply gas to stranded NIPP projects along the Escravos-Lagos Pipeline System (ELPS).

75MW EMBEDDED  POWER, NIGERIA 2014 75MW EMBEDDED POWER, NIGERIA 2014

BRIO - SIEMENS JV, LAGOS Feasibility for 75MW Combined Cycle Power Plant at Agbara, Lagos for supply of Embedded Power to Eko Electricity Distribution Plc. Brio was supported by Siemens AG in prequalifying for the Embedded Power tender.

section-eb8b6bf

Project Profile (iii)

Ecocity has an extensive track record of offering high impact strategic advisory services to oil and gas clients in Nigeria and Niger Republic.

section-26ed4f7
OIL FIELD ACQUISITION,  NIGER (2014) OIL FIELD ACQUISITION, NIGER (2014)

SAVANANAHPETROLEUM/LOTHIAN, UK Provided advisory services and support to Lothian Oil and Gas Partners for acquisition of relinquished acreages R1 and R2 in the Agadem Block. PSC signed July 2014 by Savannah Petroleum Niger SA.

OIL EXPORT PIPELINE,  NIGER (2013) OIL EXPORT PIPELINE, NIGER (2013)

DSV PETROLEUM, NIGERIA Assisted DSV in developing conceptual study for the construction of 600km Oil Export pipeline from Agadem to Chad and an optional route through Nigeria and Benin Republic.

SUPER CRITICAL COAL  POWER PLANT, NIGER  (2012) SUPER CRITICAL COAL POWER PLANT, NIGER (2012)

SIRIUS ENERGY, NIGER Ecocity carried out feasibility study for establishment of 600MW power plant at Tahoua with coal supply from Salkadamna in Niger Republic. Due diligence for relocation of available Supercritical Coal Turbine from SC, USA.

section-66545da
OIL FIELD ACQUISITION  NIGER (2012) OIL FIELD ACQUISITION NIGER (2012)

SIRIUS ENERGY, NIGER SA Preparation of Bid and successful acquisition of Green Oil block in NIger Republic for Sirius Energy. PSC signed 2012.

GAS OPTIMISATION  PROJECT, NIGERIA  (2010) GAS OPTIMISATION PROJECT, NIGERIA (2010)

BORKIR INT’L (BOGAS), LAGOS Verification of Gas Field Data, for Akam (26.7mmscfd) and Ebugbu (26,6mmscfd) Gas Fields in Niger Delta. Included reviews and matching of Various Gas Optimisation Technologies based on assessed market opportunities.

3MW CHP POWER  PLANT, NIGERIA (2010) 3MW CHP POWER PLANT, NIGERIA (2010)

DANSA FACTORY, LAGOS Feasibility for 3MW CHP Power Generation Plant for supply of combined heat and power to Dansa’s Food Processing Factory located at Abule Osun, Badagary Express Way, Lagos. Plant to be supplied by CNG feedstock from Agbara.

We provide world class Project Advisory and Support for Clients seeking to develop Energy Projects within Nigeria and the West African Region from Conceptualisation to Early Stage Development, Financial Close, EPC Phase and unto Successful Completion.

  • +234 (0) 806 063 8852
    +234 (0) 706 761 5284

  • info@ecocity.co

  • Ecocity Projects Limited,
    59 Usuma Street, Maitama,
    Abuja, Nigeria

  • Mo-Fri: 8am - 6pm
    Sat: 10am - 4pm
    Sun: off