We have a proven track record and strong credentials in conducting market assessments and advisory support across the entire oil & gas value chain.

LPG Development study

SKA ENERGY, ABUJA Under a sub-contract from Petroleum Equalization Fund, Ecocity is carrying out Feasibility Study and developing the Policy Framework for development of the Gas Infrastructure Fund in Nigeria. Study is expected to end in September 2020

2020

LPG Development study

NNPC LPG LAST MILE PROJECT

NOR ENERGY / NNPC LPG Ecocity has led discussions and engagement with NNPC LPG for the development of last mile distribution network through a franchising scheme to be operated by Nor Energy/Ecocity across Nigeria.

2020

NNPC LPG LAST MILE PROJECT

12,000BOPD Modular Refinery, Nigeria

HIGHLAND REFINERY, ABUJA Ecocity is the coordinator for a 12,000barrels per day modular refinery proposed by Highland Refinery and Petro Chemical Ltd (HRPC) to be located in Jigawa, Nigeria. Crude Oil feedstock shall be supplied from Niger Republic.

2019

12,000BOPD Modular Refinery, Nigeria

GAS SUPPLY TO 500MW IPP, NIGERIA

SUPERTEK, ABUJA Assisted Supertek in developing strategy for sourcing of gas feedstock for proposed 500MW IPP licensed by NERC for development in Ajaokuta, Kogi State. Undertook engagement with Shell and NGC on behalf of client.

2018

GAS SUPPLY TO 500MW IPP, NIGERIA

LPG Terminal Project Nigeria

SUBLIME OIL & GAS, LAGOS Prepared pre-feasibility study for establishment of 22,000m3 Propane and Butane Storage Terminal. The hub is designed to receive molecules from Dangote Refinery and other sources for resupply into the Nigerian market.

2018

LPG Terminal Project Nigeria

LPG Bottling Plant Nigeria

SUBLIME OIL & GAS, LAGOS Provided Technical Advisory and support to Sublime from 2012 to 2018 during which period assisted in the successful establishment of Sublime’s 120ton LPG Bottling and distribution Plant in Kaduna, northern Nigeria in 2014.

2012-2018

LPG Bottling Plant Nigeria

LPG Development study

DELTA AFRIK ENGINEERING, LAGOS Carried out nationwide market survey to acquire data on Gas production, storage and distribution facilities as an input to Nigeria LPG Framework Development Study (Project 11802).

2018

LPG Development study

LPG MARKET REFORMS plan LAGOS

MINISTRY OF ENERGY, LAGOS Participated in the LPG Reforms Committee alongside PWC for development of Policy Framework for reforms and development of the LPG sector in Lagos State. Ecocity Led the Technical Sub-Committee.

2018

LPG MARKET REFORMS plan LAGOS

LIGHT UP LAGOS project

MINISTRY OF ENERGY, LAGOS Ecocity worked as part of a Committee comprising of Shell, Siemens and General Electric, for the development, procurement and distribution of 3,000MW of Electricity for Lagos State. Participated in the Gas and Power Sub-Committees.

2017

LIGHT UP LAGOS project

100MGD Water Supply Project, NIGERIA

BRIO RESOURCES LTD, LAGOS Joint venture with Brio for the development of PPP Concession for a 100million gallons per day fresh water treatment plant ex Osun River. Project included transmission systems, and a reticulation network for last mile distribution in Lekki Peninsular.

2016

100MGD Water Supply Project, NIGERIA

Floating storage & Regas Unit (FSRU), Nigeria

WESTCOM, LAGOS Undertook a study for the establishment of a Floating ‘LNG' Storage and Regasification Unit (“FSRU”) offshore Lagos State. Project designed to supply gas to stranded NIPP projects along the Escravos-Lagos Pipeline System (ELPS).

2015

Floating storage & Regas Unit (FSRU), Nigeria

75MW Embedded Power, Nigeria

BRIO - SIEMENS JV, LAGOS Feasibility for 75MW Combined Cycle Power Plant at Agbara, Lagos for supply of Embedded Power to Eko Electricity Distribution Plc. Brio was supported by Siemens AG in prequalifying for the Embedded Power tender.

2014

75MW Embedded Power, Nigeria

Oil Field Acquisition, Niger

SAVANANAH PETROLEUM/LOTHIAN, UK Provided advisory services and support to Lothian Oil and Gas Partners for acquisition of relinquished acreages R1 and R2 in the Agadem Block. PSC signed July 2014 by Savannah Petroleum Niger SA.

2014

Oil Field Acquisition, Niger

Oil Export Pipeline, Niger

DSV PETROLEUM, NIGERIA Assisted DSV in developing conceptual study for the construction of 600km Oil Export pipeline from Agadem to Chad and an optional route through Nigeria and Benin Republic.

2013

Oil Export Pipeline, Niger

Super Critical Coal Power Plant, Niger

SIRIUS ENERGY, NIGER Ecocity carried out feasibility study for establishment of 600MW power plant at Tahoua with coal supply from Salkadamna in Niger Republic. Due diligence for relocation of available Supercritical Coal Turbine from SC, USA.

2012

Super Critical Coal Power Plant, Niger

Oil Field Acquisition Niger

SIRIUS ENERGY, NIGER SA Preparation of Bid and successful acquisition of Green Oil block in NIger Republic for Sirius Energy. PSC signed 2012.

2012

Oil Field Acquisition Niger

Gas Optimisation Project, Nigeria

BORKIR INT’L (BOGAS), LAGOS Verification of Gas Field Data, for Akam (26.7mmscfd) and Ebugbu (26,6mmscfd) Gas Fields in Niger Delta. Included reviews and matching of Various Gas Optimisation Technologies based on assessed market opportunities.

2010

Gas Optimisation Project, Nigeria

3MW CHP Power Plant, Nigeria

DANSA FACTORY, LAGOS Feasibility for 3MW CHP Power Generation Plant for supply of combined heat and power to Dansa’s Food Processing Factory located at Abule Osun, Badagary Express Way, Lagos. Plant to be supplied by CNG feedstock from Agbara.

2010

3MW CHP Power Plant, Nigeria

We provide world class Project Advisory and Support for Clients seeking to develop Energy Projects within Nigeria and the West African Region from Conceptualisation to Early Stage Development, Financial Close, EPC Phase and unto Successful Completion.

  • +234 (0) 806 063 8852
    +234 (0) 706 761 5284

  • info@ecocity.co

  • Ecocity Projects Limited,
    59 Usuma Street, Maitama,
    Abuja, Nigeria

  • Mo-Fri: 8am - 6pm
    Sat: 10am - 4pm
    Sun: off